Why I Awake at 3:00 AM

Although I don't technically place the concrete, I am usually involved as the Owner's rep to make sure that the right, in-spec concrete is placed - and placed correctly.  Having early morning pours helps with weather (not too hot, windy) and with supply (no one else is pouring, so there is not a competition for concrete).


Beginning of the pour - Concrete Pump Boom from the right hand side.

20081003-33108


Striking off the concrete.

20081003-33109-2

Sun is coming up.

20081003-33111

Nearing the end - sun up higher.

20081003-33116

Bull Floating to make the floor very smooth.

20081003-33134